Place of Origin: | Korea |
---|---|
Brand Name: | PMC |
Model Number: | SK120-3 E320C/D EC360 R210-9 JCB200 EX200-1 |
Minimum Order Quantity: | 1 piece |
Price: | USD30-100/piece |
Packaging Details: | Standard plywood or customized |
Delivery Time: | 2-3 days |
Payment Terms: | T/T,Western Union,Money Gram, L/C, D/A, D/P |
Supply Ability: | 500000pieces/month |
Part Name: | Gear Pump | Model: | SK120-3 E320C/D EC360 R210-9 JCB200 EX200-1 |
---|---|---|---|
Condition: | Full New,durable | Packing Details: | Standard Carton Or Required |
Function: | For Excavator | Place Of Origin: | Guangzhou,China |
Shipment: | By Sea,by Air,express Or Required | Advantage: | Factory Price |
Service: | 24 Hours Online | Special Service: | Dropship |
Material: | Steel | Warranty: | 6 Months |
High Light: | excavator equipment parts,excavator repair parts |
1) Genuine raw material : all our products used high quality raw material ;
2) Inspection : we make a very strict inspection process;
3) Quantity : we have about 1000 pieces in stock,can provide you at once;
4) Deliver time : we will deliver the goods within 2-3 days after received the payment.
Related Models We Can Offer :
Excavator Brand | Pump Type | Typical Appliion Models |
Kobelco | K3V112DT | SK200/210/230/250/330-6 |
K3V112DTP | SK200/210/230/250/330-6E, SK200/210LC/250/260LC-8, SK330NLC-6E | |
K5V140DTP | SK350LC-8 | |
Daewoo(Doosan) | K3V63DT | DH120W,DH130,DH130LC,DH130W,DH130-2, DH130LC-V, DH150LC-7 |
K3V112DT | DH200LC,DH220LC, DH215/220/225/258-7 | |
K3V112DTP | DH215/225-9, DH210/215/220/225-9E | |
K3V140DT | DH280LC | |
K5V140DT | DX300LC, DH300LC-7 | |
Hyundai | K3V63DT | R130, R130LC, R120W |
K3V112DT | R200, R200LC, R210LC-7, R210-3 | |
K3V140DT | R280LC, R290LC, R290LC-3 | |
(Samsung) | K3V63DT | MX132W, SE130W, MX135W, SE130LC-2/3 |
K3V112DT | MX202W, MX222, MX222LC, MX255LC, SE210/-2, SE200LC, EC210B, EC210C, SE240LC-3 | |
EC200B, EC240B | ||
K3V140DT | SE280LC, MX292LC, EC290B | |
K3V180DT | EC360B | |
Sumitomo | K3V63DT | S130LC-2, S130LC-3, S120W, S130W, S130-V |
K3V112DT | S220LC, S220LC-3, S220LC-V, SH200, SH200LC, SH220LC | |
K3V112DTP | SH210LC-5, SH240 | |
K3V140DT | S28OLC-3, S280-V | |
Kato | K3V112DT | HD700, HD700-7, HD700V-2/3, |
K3V140DT | HD1120, HD1220 | |
K3V112DTP | CX210B, CX240B | |
SANY | K3V112DTP | SY200 C8, SY215 C8 |
K5V140DTP | SY235 C8 | |
XCMG | K3V63DT | XE135B, XE150W, XE150D |
K3V112DT | XE215C, XE215CLL, XE215HB | |
K3V140DT | XE260CLL, XE265C | |
SUNWARD | K3V112DT | SWE210, SWE230LC, SWE230E |
K3V140DT | SWE330LC | |
K3V180DT | SWE360E | |
LIUGONG | K3V63DT | CLG915D |
K3V112DT | CLG920D, CLG922D, CLG922E, CLG923D, CLG925D, CLG925LL | |
K3V140DT | CLG933D |
Why Choose Us :
1).We are the factory loed in Jiangsu
2).Quality and delivery under control.
3).Quick response within 24 hours.
4).Small orders allowed.
5).Original packing, neutral packing or customized packing.
6).Our price is very competitive compared with other suppliers'.
7).If you only can supply the part No. No problem, just send thepart no. to me,
I will give you the right product. We have a good system about part No.
8).More than 10 years of professional manufacture experience.
Packaging Details : Carton, Standard export boxes
Port : Huangpu,Guangzhou
Lead Time : Shipped in 2-3 days after payment
Shipment : by sea,by air,express or required