Place of Origin: | China |
---|---|
Brand Name: | Taiming |
Model Number: | new model |
Minimum Order Quantity: | 1 PIECE |
Price: | USD10-100/PIECE |
Packaging Details: | Standard plywood package or customized |
Delivery Time: | 2-3 days |
Payment Terms: | T/T,Western Union,Money Gram, L/C, D/A, D/P |
Supply Ability: | 200pcs Per Month |
Model Numer: | 4472005 4469025 4472009 0824901 | Condition: | 100% New,durable |
---|---|---|---|
Part Name: | Hydraulic Parts | Function: | For Excavator |
Shipment: | By Sea,by Air,express Or Required | Place Of Origin: | Guangzhou,China |
Payment Term: | T/T, Western Union, MoneyGram | Port: | Huangpu/Nansha,Guangzhou |
Warranty: | 1 Years | Advantage: | Factory Price |
Service: | 24 Hours Online | Special Service: | OEM ODM |
Machine Model: | ZX70 | ||
High Light: | ZX70 Excavator Hydraulic Pump Parts,0824901 Hydraulic Pump Parts,4472005 Hydraulic Pump Parts |
TEM Hydraulic parts 4472005 4469025 4472009 0824901 PUMP PART FOR HITACHI ZX70 EXCAVATOR
model : 4472005 4469025 4472009 0824901
machine: ZX70
condition : 100% new,durable
function : for excavator
part name : Hydraulic parts
port : Huangpu/Nansha,Guangzhou
shipment : by sea,by air,express
payment term : T/T,Western Union,MoneyGram
warranty : 1 years
advantage : factory price
We can offer these items and models:
1. SERIES :
Excavator type | Hydraulic pump number | Rotary motor | Travel motor |
E60 | A10V40 | ||
E70B | A10V43 | EX60-1HM/SG025 | MSF45/GM08 |
E80 | K3SP36C | ||
E120B/E120 | VRD63 | SG04 | |
E180 | SPK10-10 | ||
E200B(OLD) | SPK10-10 | SG08 | E200BXM |
E240 | SPK10-10 | MX150/M5X130 | GM35VL |
E240-8 | SPV10-10 | ||
E300B | A8V0107 | M2X150 | |
E312/E312B | K3V63 | SG04 | E312XM |
E312C | SBS80 | SG04 | E312CXM |
E200B(NEW) | AP12 | SG08 | |
E320/E320V2 | AP12 | M2X120 | MCB172 |
E320B | A8V0107/AP12 | M2X120 | MCB172 |
E320C | SBS120 | M5X130 | MCB172 |
E325/325B | A8V0107 | M2X150/170 | |
E330B/E330 | A8V0160 | M2X150/170 | MCB172 |
E330C | A8V0200 | M5X180 | DNB50 |
E307/308 | A10V43/AP2D36 | MSD-44P-21-14 | GM09 |
E450 | K3V180DTH | ||
E323D | SBS140 | ||
E336D | M5X180 |
2. KOMATSU/PC SERIES ;
Excavator type | Hydraulic pump number | Rotary motor | Drive motor |
PC25/30 | A10V17 | ||
PC40 | A10V21/AP2D21 | GM06 | |
PC45/55 | A10V28 | ||
PC60-3/5 | HPV35 | GM08 | |
PC60-6 | HPV35 | ||
PC60-7 | HPV75 | GM09 | |
PC100-3/5 | HPV55 | ||
PC120-3 | HPV55 | GM17 | |
PC120-5 | HPV55 | GM17 | |
PC120-6 | HPV95 | M2X63 | GM18 |
PC200-1/2 | KPV90 | KMF90 | |
PC200-3/5 | HPV90 | ||
PC200-6/7 | HPV95 | ||
PC300-1 | KPV90 | ||
PC300-3/5 | HPV160 | ||
PC300-6 | HPV132 | ||
PC360-7 | HPV175 | ||
PC450 | HPV189 | ||
PC130-7 | GM18 |
Excavator type | Hydraulic pump number | Rotary motor | Drive motor |
SK03 | NVK45 | ||
SK07-N2 | K3V112 | MX150 | SK220-3XM |
SK07-1/2 | NV90/111 | M2X150/MX150 | |
SK09 | NV270/137 | ||
SK60 | AP2D36/A10V43/NVK45/AP2D25 | ||
SK60-1 | A10V43 | ||
SK60-2/3 | AP2D36/A10V43 | SG025 | GM07 |
SK60-5 | AP2D36/A10V43/NVK45 | SG025 | |
SK60-7 | K3SP36C | SG02 | |
SK100-3 | K3V63 | M2X63 | |
SK100-5 | K3V63BDT | ||
SK115 | K3V63 | ||
SK120-3 | K3V63 | M2X63 | |
SK120-5/6 | K3V63BDT | SG02 | GM18 |
SK200 | K3V112 | ||
SK200-1/2/3/8 | K3V112 | M2X150 | |
SK200-5/6 | K3V112BDT | M2X120 | |
SK200-6E | K3V112 | M5X130 | |
SK200-7 | K3V112 | M2X120/M5X130 | |
SK230-6 | K3V112 | M2X146/SG08 | |
SK300 | K3V180 | M2X210 | |
SK300-2 | K3V140 | ||
SK310-400 | K3V180 | ||
SK350-8 | K5V140 | M5X180 | |
SK320-6 | K3V112(Regulator with Battery valve) | ||
SK260-8 | K3V112 | ||
SK75 | PVB-3B-60 | ||
SK135 | K5V80 | SG04 | |
SK55 | A10V28 |
pin,ball guide,spring,snap ring,washer,coil spring,center pin,center ball,piston,saddle bearing,spherical washer,yoke piston,friction plate,
seperation plate,control valve,loion pin,slide block,gear,bush,nut,bearing seat,pilot valve,half ball,socket bolt,relief valve and so on.
OUR WAREHOUSE :
Why Choose Us:
1).We are the factory loed in Shandong.
2).Quality and delivery under control.
3).Quick response within 24 hours.
4).Small order allowed.
5).Original packing, neutral packing or customized packing.
6).Our price is very competitive compared with other suppliers'.
7).If you only can supply the part No. No problem, just send thepart no. to me, I will give you the right product. We have a good system about part No.
8).More than 10 years of professional manufacture experience.
Packaging Details : Carton, Standard export boxes
Port : Huangpu,Guangzhou
Lead Time : Shipped in 2-3 days after payment
Shipment : by sea,by air,express or required